Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | WEI LIN |
Model Number : | Custom |
Certification : | CE / ISO |
Price : | negotiation |
Payment Terms : | T/T, L/C |
Supply Ability : | 10000 pieces per month |
Delivery Time : | Depends on your model |
OEM ODM Food Grade SS304 SS316 SS416 Stainless Steel Patrs CNC Turning Parts
Send us your 3D drawing (STEP/IGS/SolidWorks format etc. ),specify
your requirements (your quantity, material, and surface finish
requirements etc) to our email,send us your samples to help us
quote if no drawing offered.while if you neither have drawings nor
sample, please prepare them before sending us the inquiry, thank
you!
Item Name | CNC part for production line |
Machining Equipment | CNC Machining Center, CNC Lathes, Grinding Machines, Milling Machines, Lathes, Wire-cuts machines, Laser Cuts machines, CNC Shearing Machines, CNC Bending Machines, etc. |
Processing | Lathing, Turning, Milling, Drilling, Grinding,Wire EDM, Welding, Casting, Forging, Assembling, etc |
Tolerance | +/-0.005mm |
Materials | Aluminum, Copper, Stainless steel,Iron,Resin, Plastic,plastic,Resin, PVC, Nylon and other custom materials |
If you require any other materials, please contact us to discuss | |
Surface Treatment | Blacking, Polishing, Anodizing, Chrome plating, Zinc plating, Nickel plating, Chrome plating, Ion nitriding, Titanium nitriding, Thermal treatment, Electroplating, Oxidation,etc. |
Product's Design | Customized as customers'drawings and samples. |
Inspection tooling | tool microscope, digimatic micrometer, inside micrometer, dialgage, electronic digital display caliper, automatic height gauge, precision level 2 detector, 00 levels of marble platform, ring gauge, etc. |
Our services:
1. Send us your 3D drawing (STEP/IGS/SolidWorks format etc. )
2. Specify your requirements (your quantity, material, and surface
finish requirements etc) to our email
3. Send us your samples to help us quote if no drawing offered.
Packing & Delivery:
1.Packing Detail: Each product packed with plastic preservative,
EPE, foam plastic bag, Carton outside, wood case or iron case or as
per the customer's special requirement. Besides, custom package
takes a week to prepare.
2.Delivery Detail: As customers' requirements, fast delivery takes
3 ~5 working days, slow delivery time takes 7~ 15 working days
![]() |